Custom High Precision CNC Prototype Inject Molding Custom Small PA66 PEEK POM ABS Plastic Parts
1.Free Design And One Stop Service Professional
Enginering Team15+years experience in mold
2.Competitive Price Various Molds
3.tolerance: ± 0.01mm
4.size: 5-1000mm,or customized
5.lead time:15-30 days for mould,plastic products according to quantity
- Mould Time
- 7-15 days
- Product time
- 7-15 days
- Moud precision
- +/-0.01mm
- Mould life
- 500,000shots
- Material
- ABS POM Nylon
- Size
- as customized
- Package
- carton or as requirement
- MOQ
- 10pcs
Product Description
|
||
|
Name
|
Custom design plastic products
|
Products category
|
Injection Plastic Parts
|
|
Material
|
ABS, PC, PP, , POM(Acetal/Delrin), Nylon 6, Nylon 6/6, PA 12, HDPE, LDPE, PS(HIPS), PMMA(Acrylic), SAN/AS, ASA, PVC, UPVC,TPE,
TPR, PU, TPU, PET, PEI(Ultem), PSU, PPSU, PPE/PS, PTFE(Teflon), GPPS, PPS, PPO, PES, CA, etc. |
|
Size
|
All size and thickness available.
|
|
Shape
|
capable of all shapes as per drawing
|
|
Color
|
Natural,black, Pantone code or RAL code, or as per client's samples or requirements
|
|
Hardness
|
10°~90° Shore D ,usually 20°~80° Shore D
|
|
Surface finishing
|
Texture (VDI/MT standard, or made to client's sample), polished (high polish, mirror polish), smooth, painting, powder coating,
printing, electroplating etc. |
|
Drawing
|
2D or 3D draiwng in any image/picture format is OK
|
|
Free sample
|
Yes
|
|
OEM/OEM
|
Yes
|
|
Application
|
Household, electronics, for vehicles like GM, Ford, Renault, Honda. Machinery, hospital, petrochemical, Military and Aerospace
etc. |
|
Market
|
Europe, North America, Oceania
|
|
Quality certification
|
ISO 9001:2008,
|
|
QC
|
Every order production will get more than 10 times regular check and 5 fives times random check by our professional QC. Or by
Third party appointed by customer |
|
|
||
|
Molding Process
|
Injection molding, mold processing, extrusion
|
Mould type
|
processing mold, injection mold, extrusionmold
|
|
Machines
|
350T vacuum pressing machine and other pressing machine at 300T,250T and so on
|
|
Tooling equipment
|
Rubber tension tester, Rubber vulcanization instrument, Durometer, calipers, ageing oven
|
|
Cavity
|
1~400 cavities
|
|
Mould Life
|
300,000~1,00,000 times
|
|
|
||
|
Production capacity
|
finish each mold of product in 3 minutes and working on 3 shifts within 24 hours
|
Mold lead time
|
15~35 days
|
|
Sample lead time
|
3~5 days
|
|
Production time
|
usually 15~30 days, should be confirmed before order
|
|
Loading port
|
Tianjin,Qingdao or as required
|